| March 3, 2026 | Club | The caution tape on the sidewalk on Trilogy Parkway opposite the Porto gate is again peeling even thought it was repaired a week or so ago.
| In-Progress |
| March 3, 2026 | Wine Barn | I called Feb. 25 and left a message with facilities about the lights on the Wine Barn being left on 24/7 for days. I was very thankful that someone went there to turn them off within 3 hours of my report. Unfortunately, I had to call again on Feb. 27 as they were back on again. I'm not sure that anyone showed up then or not. As of Mar. 2 they were on and they are still on today, Mar. 3.
| In-Progress |
| March 3, 2026 | Club | Can the upper shades in the gym be closed during the early morning hours please? Or if they are not working, can they manually be closed? The sunlight is literally blinding and with people’s varying compromised vision/eye health issues, this is a real problem. Thank you.
| In-Progress |
| March 2, 2026 | Wine Barn | At noon today all the string lights surrounding the wine barn park were on. Why?
| In-Progress |
| March 2, 2026 | Wine Barn | The string lights around the park at the wine barn were on at noon today.
Robert: We are having an issue with the controller work order for tomorrow.
| In-Progress |
| February 28, 2026 | Villages | I was out walking this afternoon and noticed that the crosswalk lines at the intersection of Zinfandel and Chianti are crumbling. Similar issue for the crosswalk at Miwok and Barbaresco although it appears to be small sections missing rather than crumbling.
| In-Progress |
| February 28, 2026 | Wine Barn | I walked by the wine barn this afternoon a few minutes after 4:00. All the string lights were on. Why? Sunset is not till 6:00. Most likely the timers need to be adjusted.
Robert: I will go and check the controller.
| In-Progress |
| February 28, 2026 | Villages | I wanted to let you know that while I was walking the other day I noticed a big bush growing out of the storm drain in front of 1811 Moscato Place.
It looks like an Oleander, which is quite hardy and can get quite large, it is already taking up a good amount of space within the storm drain. It should be addressed as soon as possible so it is easier to remove.
The more established the roots get the bigger the issue will be to get it out of there. If they just cut it off, it will regrow still fuller down in the storm drain, which could be very problematic when we get rain again.
Thank you in advance for taking care of this issue.
Terry Eldridge
| In-Progress |
| February 28, 2026 | Gates | Barossa pedestrian gate on Trilogy Parkway does not work.
Robert: I will open a work order for repair.
| In-Progress |
| February 27, 2026 | Vineyards | Vineyards behind Moscato.
The weeds are about 2 Feet tall behind the last row of vines and the the retaining wall.
Is this the famers job?
Thanks
Ken
| In-Progress |
| February 24, 2026 | Villages | Hi, please let me know if I should be emailing someone else about this long standing issue. There is a house at 1738 Latour that is a rental but the front yard has not been maintained for years. It is mostly weeds and animal holes and mounds that are an eyesore. Several neighbors have complained but nothing changes. This is an insult to those of us who try to comply with the reasonable guidelines.
I'm not sure if the owner is responsible or the tenant. Will you let me know and tell us what can be done?
Thank you,
Dr. Woodruff
Robert: Hello Dr. Woodruff.
I will forward your concerns to the HOA office asap.
| In-Progress |
| February 23, 2026 | Club | The former handicap parking stalls that are now open parking stalls need to have the old pavement symbols repainted black. The forecast is calling for rain this week (2/23/26) I checked and did not see any previously submitted maintenance requests. Thank You
Robert: Mark the stalls are to be blacked out when the paving contractor comes back to do the top sealant coat. The contractor is waiting for a full week of dry weather with appropriate temp to aide drying.
| In-Progress |
| February 22, 2026 | Villages | There is a caution tape on the sidewalk across from the Porto gate that has lost adhesion and is half way come off.
Robert: I will apply new tape and notify HOA on the issue so they can have the sidewalk ground down or replace that section.
| Completed |
| February 19, 2026 | Landscape | I am one of the Trilogy Pickleball Club Board members and have a maintenance issue for you. Two new shade structures were added along one side of the pickleball courts. The posts supporting these structures sit in one of the grass areas that is irrigated using pop up sprinkler heads. Some of these sprinkler heads now need to be adjusted to both reduce the amount of overspray on the posts and to ensure the surrounding grass still receives the water it needs.
Thank you!
Robert: I will instruct our landscaping contractor to adjust.
| In-Progress |
| February 18, 2026 | Tennis / Pickleball Court | Clock on pickleball court is gone. I think it fell down in the storm and broke.
Robert: A new clock has been ordered, 02/19.
02/20. New clock installed
| Completed |
| February 18, 2026 | Tennis / Pickleball Court | Several of the electrical outlets at the tennis and pickleball courts don't work. We need them to work for special events to aid in food and beverage service, and potentially to help dry and clean the courts. Please restore all outlets near the shade structure between the tennis and pickleball courts to a functioning level.
Robert: I have created a work order for these repairs.
| In-Progress |
| February 12, 2026 | Villages | Pathway lights walking down to the Porto gate from the clubhouse are still out. This problem has been reported to the concierge but still not fixed.
Robert: The Programming tech had a family emergency the day before our appointment. we are waiting for a new date and time for the programmers return.
| In-Progress |
| February 11, 2026 | Club | apparent new(ish) asphalt rupture in parking space, first stall left side, 2nd level, across from pickleball courts
| In-Progress |
| February 10, 2026 | Villages | The is a cobblestone "path" going from Chardonnay to the vineyards and "trail" behind California Trail. It is loaded with weeds.
Robert: HOA responded to this request
| Completed |
| February 10, 2026 | Gates | entry gate staying open at Porto Village
| Completed |
| February 8, 2026 | Club | The ceiling fans in the gym are rotating at various speeds (some slow, some fast), even though the selector on the wall is set to “fans hi.” In addition, one fan is not working at all. Thank you.
Robert: The Programming tech had a family emergency on the 4th the day before our appointment. we are waiting for a new date and time for the programmers return.
| In-Progress |
| February 3, 2026 | Villages | 2ND REQUEST the street light on Solera st by meritage loop park pergola is still out. Please follow up with a course of repair.
Robert: I will forward to HOA office.
Message sent to HOA
| In-Progress |
| February 3, 2026 | Gates | At the St Julien gate, the pedestrian gate closing mechanism is not attached to the gate. (I don't know if it's supposed to be attached or just push against it.) The gate seems to latch OK if it's released from wide-open, but it does not latch if released from nearly-closed.
Robert: I adjusted the closing hinge spring. The gate now closes from 4in away. Also, the mechanism you see is installed correctly it's a closer assist.
| Completed |
| February 1, 2026 | Gates | Viognier Ct pedestrian gate lock not working. No power to keypad. Barsac working fine
Robert: New batteries has been installed twice in 2 weeks. We will replace the lock.
| Completed |
| January 31, 2026 | Landscape | Trail on Chardonnay lane in need of weed removal.
Robert: HOA office has been informed
| Completed |