Maintenance Issue Reports

Trilogy® at The Vineyards

Displaying 751 - 775 of 875

Entries
 Reported Location Issue Status
June 26, 2026Vineyards

Large Sprinkler break in vineyard behind 1715 Chardonnay Lane

In-Progress
June 26, 2026Gates

Pedestrian gate at Saint Julian is no longer attached securely to the post.

Robert: A work order has been generated. Thank you for the report.

In-Progress
June 27, 2026Landscape

Oak trees along Vineyards Pkwy - starting at St. Julien entrance and ending at NE entrance to Monte Rosa park - were recently trimmed by the city, I assume. However, no one picked up the tree debris. They are laying all over the plants. I moved some of them onto a utility cover (see attached picture) but there's lots more all over the plants along the sidewalk.

In-Progress
June 29, 2026Gates

My gate code is not working for my visitors, also on MTL gate code not working.my card and car responder is ok.

In-Progress
June 30, 2026Gates

The Latour and The St. Julien Gates:
A regular visiting guest received a beeping signal at both the latour and St Julien gates after trying both Steve and my codes were used. She was not able to get into the gate until a golf cart came by and used a card.

In-Progress
June 30, 2026Vineyards

Same major vineyard leak as a few weeks ago. The fellows repaired that and it’s leaking again. It’s in the vineyards behind the middle of Moscato and there’s several smaller leaks along the way, but the major leak runs past at least three or four houses on Moscato. They can’t miss it if they drive behind Moscato. I reported the same leak several weeks ago.

I submitted a similar photo a few weeks ago.

In-Progress
June 30, 2026Gates

2nd time today - - I had a delivery scheduled, he tried both Bordeaux gates and neither gate would accept our codes. Please help!

In-Progress
July 3, 2026Villages

Paint peeling off pillar at Latour pedestrian gate.

In-Progress
July 3, 2026Villages

Paint peeling off pillar at Latour pedestrian gate.

In-Progress
July 4, 2026Villages

Lawn dead and weeds in cracks of driveway no maintenance of yard

In-Progress
July 5, 2026Club

The up lights under the two Magnolia trees out from the event entrance parallel to the parking lot as well as the one on the opposite of the circle in the same position. These have been burned out pretty much since we have lived here six plus years.
See pics for location

Could not drop file. attachement. Hi Ken, we have an electrician coming out on 7/22 at 6pm. thanks.

In-Progress
July 6, 2026Wine Barn

Wine Bar outside lights have been on for days 24-7. Can't this be put on a timer that will shut off if not in use? We are looking at the options of installing a timer or photo cell. we will update once completed. thanks,

In-Progress
July 7, 2026Landscape

The sign is down at the entrance to Miwok Park (the one that has the hill).

In-Progress
July 13, 2026Landscape

Sprinkler at divide area of entrance to Andalucia.
Lots of water at each watering for small area.
Much run off onto street.

May be adjust water a little?
White pipe to help soil drainage would love a little less water too.

Thank you.

In-Progress
July 13, 2026Landscape

Lots of water at each watering for small green area.
White pipe to help soil drainage, I guess, would love less water.

Much runoff onto street.
At divide/entrance of Andalucia gate.
Please check sprinkler. Thank you.

In-Progress
July 14, 2026Vineyards

Same 2 water leaks as 1-2 weeks ago behind Frascati.

In-Progress
July 15, 2026Landscape

Took much water for little green patch ?
Run off onto street.
Please check & adjust. Andalucia gate.
Thank you.

In-Progress
July 21, 2026Villages

This is my second report of large cracks on upper Gamay Lane of Bordeaux village our home. The crack has gotten wider since my last message. Does not appear that the company hired did not completely fill the cracks from the original repair. There are quite a few road cracks in the upper Gamay Lane. When can we expect this to be repaired properly?
Thank you

Best

Keith Groves

In-Progress
July 21, 2026Villages

This is my second report of large cracks on upper Gamay Lane of Bordeaux village our home. The crack has gotten wider since my last message. Does not appear that the company hired did not completely fill the cracks from the original repair. There are quite a few road cracks in the upper Gamay Lane. When can we expect this to be repaired properly?
Thank you

Best
Keith Groves

In-Progress
July 24, 2026Villages

There is a tree in the olive grove behind our house that has a dead branch. This branch is hanging over the fence above our yard. Please have the dead branch removed and thin the overhanging branches. Thank you.

In-Progress
July 28, 2026Villages

The hillside to the north of Barbaresco sloping down from Upper Miwok Park has long grass which appears that the irrigation system is not working as it is mostly turning brown.

In-Progress
July 28, 2026Pool

I believe the indoor pool equipment is moldy, the white weights and noodles.
Thank you!
Scott: a work order has been placed. thank you for bringing this to our attention

In-Progress
July 30, 2026Landscape

North end of Miwok walking path area has several dry areas of grass due to lack of enough water for the heat we are experiencing.

In-Progress
August 4, 2026Club

The bottle-fill function on the gym drinking fountain has been broken since May.

I submitted a written report at the gym in May, and the maintenance sheet stated that parts were ordered on May 29. Since then, I have requested updates on that sheet several times, but none have been provided.

Yesterday, I spoke with Pria at the concierge desk. She checked the records and found that the repair had been reported as completed in May. That information is incorrect. The bottle filler was not fixed and still does not work.

Facilities has reset the unit more than once. Each time, it worked only once or twice and had stopped working again by the following day. Clearly, resetting it is not a repair.

Please have Facilities correct the inaccurate record, determine what repair or replacement is actually required, and provide a specific status update and expected completion date. After more than two months, this should not remain unresolved without any explanation.

Thanks. Hi Frank, we had two companies look at this without any luck. we will be purchasing a new unit shortly. we apologize for the inconvenience and thank you for your patience.

In-Progress
August 5, 2026Villages

Would like roof inspection of my home. 2100 Solera street. Thanks

In-Progress
 Reported Location Issue Status

LEARN ABOUT THE HOMES AT OUR COMMUNITY:

Call 800.685.6494  |  Join Our Interest List